Global Localization
Proprietary industrial systems with support for regional assembly and international deployment.
ThermoSonic™ technology is designed for international industrial deployment with support for local assembly, regional participation and localization initiatives.
Oman Industrial Localization & Deployment
Regional assembly and field implementation aligned with In-Country Value initiatives.
Project Overview
ThermoSonic™ systems were deployed in Oman (2023-2025) as part of an international industrial localization initiative associated with:
- In-Country Value (ICV)
- Made in Oman
The project included:
- engineering manufacturing of core systems (September 2023 - Janury 2024);
- international logistics (December 2023 - March 2024);
- regional assembly in Oman (15 March - 15 April 2024);
- field deployment on operational oilfield infrastructure (February - March 2025).
ThermoSonic Technology: Revolutionizing Heavy Oil Flow Assurance and Production Optimization
DOI: 10.2118/229978-MS
STAGE 1 — ENGINEERING & MANUFACTURING (September 2023 - January 2024)
Core ThermoSonic™ systems were engineered and manufactured by Research and Production Bureau ENERGIA prior to international deployment.
TS control system assembly
Transformer Core fabrication
Production of magnetic components
TS Housing
TS Power Rack assembly
Installation of TS System Components
STAGE 2 — EXPORT LOGISTICS (December 2023 - March 2024)
From snow-covered workshop to Oman desert deployment.
After factory testing, ThermoSonic™ systems and auxiliary equipment were prepared for shipment from Russia to Oman.
TS units loading
TS units loading
Crated TS Components prepared for shipment
TS cable reels loading
Export Packaging of TS Units
Final shipment preparation
STAGE 3 — ARRIVAL & REGIONAL ASSEMBLY IN OMAN (15 March - 15 April 2024)
Following delivery to Oman, the systems were assembled and prepared for field deployment in alignment with regional industrial localization initiatives associated with:
- Made in Oman
- In-Country Value (ICV)
Arrival of TS Equipment in Oman
TS Equipment delivered for regional assembly
TS components staged for assembly in Oman
TS Components delivered for regional Assembly
TS engineering Team in Oman
Final assembly of ThermoSonic control systems
Configuration and testing of ThermoSonic control systems
Regional assembly workshop in Oman
ThermoSonic control systems ready for installation
Completed ThermoSonic units ready for field deployment
Field-ready ThermoSonic™ units
Next stop: the oilfield.
ThermoSonic units delivered to the oilfield
STAGE 4 — FIELD DEPLOYMENT & COMMISSIONING (February - March 2025)
ThermoSonic™ systems were transported to operational oilfield infrastructure for installation and commissioning on active pipeline systems.
Field deployment of ThermoSonic systems
System configuration by the ThermoSonic development team
ThermoSonic field cables installed along the pipeline corridor
Basic operator instruction for local personnel
Field deployment supported by the ThermoSonic development team
Cable system installation led by a ThermoSonic specialis
OPERATIONAL RESULTS
Successful deployment of ThermoSonic™ systems on heavy-oil flowlines in southern Oman.
- Reduction of flowline backpressure by 20–45%, improving flow stability under winter operating conditions.
- Restoration of continuous production in previously non-flowing wells affected by high oil viscosity during cold periods.
- Up to 35% production increase observed after ThermoSonic™ deployment and well optimization.
- Stable operation achieved while maintaining external flowline temperatures below 65°C, protecting plastic-lined infrastructure.
- Lower energy consumption compared to conventional thermal methods, without chemical injection or invasive pipeline modification.